Description
Wetted materials of construction are, with double EPR O-ring seals. The first O-ring is the only one to touch the process fluid, allowing the second O-ring to operate free from chemical attack. The Thermowell containing the temperature sensing element in its tip is exposed directly to the stream, assuring rapid automatic compensation for maximum accuracy.
Process connections are 3/4" NPT for insertion, and the back portion is 3/4" stainless steel tubing, which can be gripped by a swage fitting for submersion applications. A Telomere;* insulator is available as an option to the standard CPVC.